All articles

Building a Home Cinema Around Existing Equipment: Astrakhan

Can equipment collected over many years become a coherent home cinema? Our Astrakhan project brings together acoustic modelling, sound isolation and an eleven-subwoofer system.

Visualization of a home cinema in Astrakhan with open acoustic treatment

Buying acoustics and amplifiers doesn’t always start with a room design. Owners sometimes assemble components for years and turn to engineers when a significant portion of the system has already been purchased. Thus began the history of a home cinema in Astrakhan: the customer wanted to keep his equipment and finally hear it in a specially prepared room.

We implemented this cinema in 2024. It is designed for seven spectators, combines acoustics of different series, eleven subwoofers and a projection on the screen of 154 inches. The main task was to align the equipment with the geometry of the room and get a verifiable result within the selected budget. Astrakhan project card

The first step is to assess the capabilities of the existing system.

The acquaintance with the owner took place at our partners AVnirvana, where he came to choose a projector. By this point, it already had Klipsch acoustics, a StormAudio processor and amplifiers. Usually, Cinema Project selects equipment within the framework of a general engineering concept. Here we made an exception: we studied the kit and agreed on the restrictions that it imposes on the future hall.

Such a project begins with a check of the system composition. It is important to understand which loudspeakers are suitable for the front, encirclement and ceiling, whether amplification is enough where additional equipment will be needed. After that, you can determine the landing and design of the room. Purchases become the initial data for calculation. Project and equipment audit

Cinema Project in Astrakhan: two rows of seats and open acoustics

Implemented hall: the equipment of the owner became part of a single designed system.

Landing, screen and acoustics are calculated together

In the first row, three chairs were placed, in the second - four seats on the podium. The lifting of the back row allows you to see the screen on top of the spectators sitting in front. The position of the seats was coordinated with the direction of loudspeakers and the future pure geometry after the sound insulation device.

The 154-inch screen is part of the scheme. Acoustically transparent canvas allowed to install frontal acoustics behind the image. The size of the frame, the depth of the screened structure and the distance to the audience were determined together - changing one of these parameters affects the rest.

Plan of home cinema in Astrakhan with placement of screen, seats and loudspeakers

The project plan connects the location of the audience, screen and acoustics.

Sound insulation became the finish line

The cinema is located on the first floor next to the living quarters and kitchen. For him, an individual sound insulation shell was developed based on TechnoSonus solutions. The walls and ceiling received a stepped shape, which was previously included in the acoustic model. TechnoSonus in the catalog of brands

Additional interior cladding was not done: the shell was painted black, and the acoustic panels were left open. White LED lines emphasize the ceiling steps and provide light for maintenance. Absorbers and diffusers simultaneously work with sound and form the character of the room.

Step soundproofing shell of the cinema before painting and installation of equipment

Sound insulation shell at the construction stage: its geometry is specified by the project.

The entrance is closed by a soundproofing door made for the hall. In the design of the room, ventilation with recovery and air conditioning are also integrated. Heating radiators are closed with acoustic panels. The interfaces of the door, climate systems and shell were worked out together.

Manufactured for the project sound insulation door home cinema

The door is made for the project and coordinated with the design of sound insulation.

Why Different Acoustics Need Simulation

In this room there are Klipsch loudspeakers of several series. Their orientation varies, so the same distance to the seats does not mean the same coverage. We calculated the positions and orientation of the systems before installation: it is important that the movement of sound between the channels remains consistent for both rows.

The acoustic model was also used to select the location of the panels. She helped assess reflections, sound attenuation and the interaction of loudspeakers with the room. At this stage, changing the installation angle or panel design is much easier than after finishing. acoustic modelling of the home cinema

Design sections of the cinema and the directional scheme of loudspeakers

Design incisions and radiation directions: verification of solutions before installation.

Installation of cable tracks and preparation of the room before installation of acoustic panels

Tracks and connections were prepared according to the project before installation of equipment and finishing elements.

13.1.7 and eleven physical subwoofers

The system format is 13.1.7: thirteen main-level channels and seven high-altitude ones. The central area includes the lower and upper centers; an additional ceiling central loudspeaker continues the sound field above the audience. The unit in the format record denotes the LFE low-frequency effects channel, and the number of subwoofers is specified separately.

The low-frequency system consists of five Klipsch KW-120-THX and six JBL Professional 4645C. Such a number of sources requires especially careful coordination: each interacts with the room and with the rest of the subwoofers. The location was determined in the project, and delays, levels and filtering were specified during commissioning. JBL Professional

Processing is performed by StormAudio ISP Elite 32 of the first generation. The boost includes the ATI AT3007, AT528NC and AT1805, as well as Eurosound, Klipsch and Diamond components from the owner's kit. When selecting roles for the equipment, the load and necessary stock of each channel group were taken into account. StormAudio processors

How to keep the budget without too much finishing

The main savings came from several solutions: they retained the suitable components of the customer, used a calculated combination of materials and abandoned a separate decorative layer. Cinema Project’s own panels have become a visible part of the interior. Each decision was evaluated by its function in the overall system.

Absorbing and dispersing Cinema Project acoustic panels in the interior of the home cinema

The acoustic panels remained open: their pattern and rhythm set the appearance of the cinema.

There is no universal percentage of savings in this approach. Existing equipment can reduce purchases, but complicate design and setup. Therefore, first you need to assess the compatibility of components, the capabilities of the room and the amount of necessary improvements.

Calibration completes the work started in the project

The setup took a few days. We measured each channel in the listening area, coordinated levels and time parameters, checked the collaboration of subwoofers with the main acoustics. The Earthworks hardware and software complex and microphone were used for measurements.

Earthworks Measuring Microphone When Calibrating a home cinema

Measuring microphone in listening area during calibration.

Checking several places is especially important for a two-row hall. The setup should take into account both listening areas, not just one seat. Measurements allow you to compare the built system with the design model and determine what adjustments are still needed. Sound and image calibration

Measuring equipment and laptops during sound tuning in the cinema

Measurements and adjustments were carried out after major construction work was completed.

For this project, CEDIA Level 2 is listed in our portfolio. The level describes the characteristics of the system and listening conditions; it cannot be determined only by the brand of acoustics, the number of channels or the number of subwoofers. How to use CEDIA/CTA RP22

Projection: Stewart, JVC and MadVR software

The video system uses an acoustically transparent Stewart Harmony G2 canvas. Placement of front loudspeakers behind the screen helps to link the dialogues and events of the sound scene with the image. Stewart Filmscreen screens

Cloth and frame acoustically transparent screen Stewart Harmony G2

Stewart Harmony G2: Acoustically transparent canvas for the front zone of the cinema.

Laser JVC DLA-NZ900 with native 4K-matrix installed on the shelf in the rear of the room. The black surfaces of the room help limit reflected light. The projector itself is consistent with the screen size, installation distance and viewing conditions. JVC projectors

Projector JVC DLA-NZ900 on the shelf in the rear of the home cinema

The JVC DLA-NZ900 is installed on a separate shelf at the back of the hall.

The main source of the owner is a PC with a discrete graphics card and a software video renderer madVR. It uses processing on a computer rather than a separate Envy processor. The system is complemented by GIEC 6300, Zappiti, NVIDIA SHIELD, PlayStation and EVOBOX Premium karaoke: the hall is designed for movies, concerts, games and meetings with guests.

The server is under the cinema.

The main rack was placed in a separate room in the basement. Here are the processor, amplifiers, sources, PCs and power supplies. This allows you to service most of the equipment outside the spectator area. The devices, which need frequent access, were left under the screen - in the open bottom of the hybrid screen wall.

Server rack with processor, amplifiers and sources in the basement under the cinema

The main rack is located in the basement directly under the cinema.

What this experience gives to the owner of the finished kit

The purchased equipment does not close the way to a fully equipped home cinema. But the ability to save it must be evaluated before construction: check the composition, determine restrictions, calculate the room and provide time for adjustment. In Astrakhan, it was this sequence that helped turn a long-standing collection of equipment into a concerted cinema.

Watch the film at the finished home cinema Cinema Project in Astrakhan

Ready-made cinema in Astrakhan: engineering structures and acoustics remain part of the interior.

If some of the components are already there, for the first discussion, prepare their list, room plan, ceiling height and landing wishes. This will help you understand what solutions can be saved and where to start the project. Our guide explains the stages of work and questions that are useful to ask the designer. Open the customer guide